FRA-71-5.29
Project Type
MOTAA
Clients
The Ohio Department of Transportation (ODOT) District 6
Location
Columbus, Ohio
Cost
$41,500,000
Project Details
This project involves the major pavement rehabilitation of I-71 from State Route 665 to Stringtown Road. The project involves full depth pavement and an additional third travel lane in each direction that will be added to the median. ELR completed a MOTAA where several concepts were evaluated, leading to the selection of a part-width MOT plan. The FRA-71-0903 L/R structures over White Road will be replaced with single span prestressed concrete I-beam structures. All existing signs and guardrail will be replaced and the drainage was evaluated for replacement, repair, or reuse. In addition, the project involved 5 noisewalls and lighting design.
Services & Markets
Transportation
FRA-71-5.29
This project involves the major pavement rehabilitation of I-71 from State Route 665 to Stringtown Road. The project involves full depth pavement and an additional third travel lane in each direction that will be added to the median. ELR completed a MOTAA where several concepts were evaluated, leading to the selection of a part-width MOT plan. The FRA-71-0903 L/R structures over White Road will be replaced with single span prestressed concrete I-beam structures. All existing signs and guardrail will be replaced and the drainage was evaluated for replacement, repair, or reuse. In addition, the project involved 5 noisewalls and lighting design.


